Athienou 2021

Cyprus

The Athienou solar park, with a total installed capacity of 0.81 MWp, was connected to the grid in autumn 2021. For SOLEK Group, this is the first ever completed solar power plant in Cyprus, which enjoys one of the highest solar irradiation rates in the EU.

Technical specifications:

Installed capacity: 0.81 MWp
Panels: LONGI SOLAR LR4-72HBD
No. of panels: 1 836 pcs
Inverters: Sungrow SG110CX

Projects under implementation