Curicura 2021

Chile

The Curicura solar park, with a total installed capacity of 10.64 MWp, was connected at the end of 2021. It is located in the Maule region. The plant was built for the Rockville Investment Company Fund, and SOLEK continues to provide O&M services to it to ensure it provides maximum efficiency as a fully operational plant. The solar park is built under the PMGD regime, a distributed energy resource whose spatial diversification ensures Chile's energy security.

Technical specifications:

Installed capacity: 10.64 MWp
Panels: Trina Solar
No. of panels: 24 192 pcs
Inverters: SunGrow
Trackers: PowerWay


Map:

Projects under implementation