The El Conquistador solar park, with a total installed capacity of 2.97 MWp covers an area of 6.51 hectares and is the third of a total of 6 planned photovoltaic projects by the SOLEK Group in the town of Quirihue in the Ñuble region, south of the capital Santiago.
| Installed capacity: | 2.97 MWp |
| Panels: | HTSAEE |
| No. of panels: | 6 720 pcs |
| Inverters: | SunGrow |
| Trackers: | PowerWay |